NEXT HOTEL, MELBOURNE

This project contains two hoods on different levels and was complicated by very low ceiling heights which meant we were limited in duct size and position.

 

For Level 1 we were required to duct the makeup air into the front of the hood and KEX out of the back as there was insufficient room to use standard top ducting.

 

For level 3 we had to utilise multiple flexi ducts for the supply air.

level 3 next hotel melbourne.jpg

Level 3 Kitchen