top of page
P R O J E C T S
EL CAMINO, BRISBANE
El Camino was our 1st reticulation system where we reticulated about 40% of the airstream to reduce duct and fan size requirements.
This was due to the restaurant being a refit of an existing ground floor coffee shop in a 5 story building.
The new Mexican cuisine required over 1,000MJ of cooking power.
If we opted for a traditional AS1668 solution we would have had to install larger ducts and a fire rated tube through multiple tenancies on the way to the roof.
The reticulation solution solved this and reduced the overall base build of cost of the project by over $200,000 and reduced the construction timeline by many months – a great result all around.
![20181128_075222495_iOS.jpg](https://static.wixstatic.com/media/09e6c7_d93134bb70e34b36a6a72a236fffb1a0~mv2.jpg/v1/fill/w_314,h_314,q_90/09e6c7_d93134bb70e34b36a6a72a236fffb1a0~mv2.jpg)
![20181204_220105455_iOS.jpg](https://static.wixstatic.com/media/09e6c7_41c8d7cce87e46c29ad7ed35238d47b2~mv2.jpg/v1/fill/w_314,h_314,q_90/09e6c7_41c8d7cce87e46c29ad7ed35238d47b2~mv2.jpg)
bottom of page